| Epic - Start of Trail Work MAMBO KINGS 6/18/03 |
| IMBA has a system to teach people how to built better trails. Before work began everyone was walked through the build area and the rationale was explained. Brush cutting was done and the surface was prepared. One last photo of the old, worn out trail is included. |
| P1010209.jpg | P1010214.jpg | P1010216.jpg | P1010217.jpg |
| P1010218.jpg |